Before a new molded or machined plastic part goes into production, the buyer needs evidence that the tool and process make parts that match the drawing. That happens in stages: tool trial samples (often called T0, T1, T2), then a formal first article inspection (FAI) on production-representative parts, then sign-off. This guide explains each stage, what an FAI report contains, how it relates to formats such as AS9102 and PPAP, what to specify, and the pitfalls that are specific to plastic parts.
Tool trial stages: T0, T1, T2
Naming varies between toolmakers, but the pattern is similar. T0 (or the first shots) checks that the tool runs: it opens and closes, ejects, fills and has no obvious mechanical problems. T1 is usually the first set of samples sent to the buyer, with a sample report showing key dimensions and visible defects. Corrections follow, such as adjusting steel for dimensions, polishing, texturing, opening gates or improving venting, and the next trial (T2 and onwards) checks them. Some tools need one round of corrections; complex ones need several. Agree up front how many trial rounds the tool price includes and how many samples are sent at each stage. If you can’t be at the press, agree the photos, video and process data you’ll get from each round; see remote mold trials. When the first report arrives, our guide to reading a T1 dimensional report shows what to check line by line.
What to check on T1 samples
- Critical dimensions and fits, with mating parts if possible.
- Cosmetic defects on visible faces: sink, flow lines, weld lines, gate marks.
- Warp and flatness.
- Assembly: snaps, screws, inserts.
- Color and texture against the approved standard.
- Any functional requirement such as sealing or strength.
Record findings with photos, locations and part numbers by cavity. Separate design-driven issues (which need your decision) from tool and process issues (which the supplier fixes). See molding defects.
What a first article inspection is
FAI is the formal check of parts made from the corrected tool, with the intended production resin and process, against every requirement on the drawing. It is usually documented in a report the buyer approves before production. Running FAI on early trial parts wastes effort and can approve parts made under conditions that will not repeat.
| FAI element | Content |
|---|---|
| Ballooned drawing | Every dimension, note and specification numbered |
| Dimensional report | Measured value per balloon against nominal and tolerance, pass/fail |
| Measurement method | Instrument for each characteristic: caliper, CMM, optical, gauge |
| Material documentation | Resin grade and lot, certificates of conformance |
| Cosmetic check | Against agreed standards or limit samples |
| Functional checks | Fit or performance tests if specified |
| Special processes | Painting, plating, printing records where relevant |
| Sign-off | Supplier and buyer approval |
Send your drawing and inspection requirements
Cavities and sample size
In a multi-cavity mold, each cavity is effectively a separate part and can differ slightly. A full FAI usually covers parts from every cavity. Agree how many parts per cavity are measured and whether all dimensions are checked on every cavity or only critical ones. For machined parts, FAI covers the first part from the approved program and setup, and is repeated if the program or setup changes significantly.
Measurement methods
Simple dimensions are checked with calipers, micrometers and height gauges. Complex geometry, hole positions and profiles are usually measured on a coordinate measuring machine (CMM) or with optical and vision systems, which avoid deflecting thin parts. Go/no-go gauges and assembly fixtures check fits quickly. 3D scanning compared against the CAD model gives a color map of deviation, which is useful for warped or freeform parts but less precise for tight individual features. The FAI report should name the method for each characteristic, so the buyer can repeat the measurement and compare like with like. Disagreements between supplier and buyer measurements are common; agreeing methods and datums in advance avoids most of them.
Formal formats
| Format | Where used | Notes |
|---|---|---|
| AS9102 | Aerospace | Standard FAI forms covering part number, materials and special processes, and characteristics |
| PPAP | Automotive | Broader package with submission levels; includes dimensional results, material records, process flow, control plan, capability data and a part submission warrant |
| Customer-specific forms | Medical, industrial and others | Often based on AS9102 or internal templates |
| Simple dimensional report | General industrial | Ballooned drawing and measurement table |
Say which format you need at quotation. A full PPAP or AS9102 package takes much more work than a simple dimensional report, and not every supplier is set up for every format.
Plastic-specific pitfalls
- Measuring too soon. Molded parts keep shrinking for hours or days. Agree a conditioning time before measurement.
- Moisture. Nylon changes size as it absorbs moisture; say whether dimensions apply dry or conditioned. See nylon 6 vs nylon 66.
- Temperature. Plastics expand much more than metals; measure at a controlled temperature.
- Flexible parts. Thin or soft parts deform under contact measurement; define fixturing.
- Warped parts. Flatness and profile depend on restraint; agree datums and restraint conditions.
- Drafted faces. Dimensions depend on where they are measured; see draft angles.
Deviations and re-submission
When an FAI shows dimensions out of tolerance, there are three usual paths: correct the tool or process and re-submit; accept the deviation with a recorded concession if it does not affect function; or change the drawing if the tolerance was tighter than needed. Record the decision and the reason. Undocumented deviations cause disputes later, especially when a tool moves to another supplier. Steel-safe dimensions, left slightly on the side where steel can be removed, make corrections easier.
After approval
FAI shows the process can make a correct part; it does not guarantee every later part. Ongoing quality relies on in-process checks, periodic dimensional audits and change control. Before a production lot leaves the shop, plan a pre-shipment inspection of that lot against the approved sample. Keep approved samples, sometimes called golden samples, from each cavity, sealed and labeled, as a reference for later disputes and for tool transfers. If a dimension was close to its limit, agree how it will be monitored.
For machined parts, the same logic applies: keep the approved first part and the program revision together, so a later batch, or a batch from a new machine, can be compared directly with what was approved.
Inspection steps compared
| Step | Purpose |
|---|---|
| T1 sample report | Early check of trial parts to guide corrections |
| First article inspection | Formal approval of production-representative parts |
| Incoming inspection | Buyer check of delivered lots |
| In-process inspection | Supplier checks during production |
| Pre-shipment inspection | Check of a finished lot before it ships |
What to specify
- Drawing revision and critical characteristics.
- Number of trial rounds and samples per stage.
- FAI format and level.
- Parts per cavity to be measured.
- Conditioning time and measurement temperature.
- Fixturing for flexible or warped parts.
- Material certification and cosmetic standards.
For the wider set of paperwork you can ask for alongside an FAI, such as a CoC, resin lot certificates and PPAP elements, see what quality documents you can request for custom plastic parts. A clear drawing makes all of this simpler; see drawing tolerances and our quality approach.
Frequently asked questions
What is T1 in injection molding?
Usually the first set of trial samples sent to the buyer after the tool runs, used to find corrections before production.
What is first article inspection?
A formal check that production-representative parts meet every drawing requirement, documented for approval.
What is the difference between FAI and PPAP?
FAI verifies the first parts. PPAP, used in automotive, is a broader package with process documentation and capability data.
Should every cavity be inspected?
Usually yes for a full FAI, because cavities can differ.
When should molded parts be measured?
After an agreed conditioning time, because they keep shrinking and some absorb moisture.