The T1 dimensional report is usually the first document that tells you whether a new mold actually makes your part. It turns up with the first samples, as a spreadsheet or PDF next to a ballooned drawing, and it’s tempting to scan the pass column and move on. This page shows you how to read a T1 dimensional report for plastic parts line by line, what to check before you trust it, and what to ask for when something’s missing. If you want the whole sample approval sequence, our sample approval and first article inspection guide covers it. Here we stay on the report.

Molded plastic sample parts, a steel mold insert and a digital caliper laid out for a T1 dimensional check

Generic illustration, not a part ProteForm made.

What’s actually on a T1 dimensional report

Formats vary from shop to shop, but most T1 reports from a mold maker or molder carry the same fields. If you know what each one is for, you can spot a thin report in a couple of minutes.

Column or fieldWhat it tells youWhat to check
Balloon numberWhich feature on the drawing the line refers toEvery balloon on your drawing has a line. Gaps usually mean the feature was skipped, not that it passed.
Nominal and toleranceThe target the shop measured againstIt matches your released revision, in your units. A copied tolerance from an older drawing is a common slip.
Measured value, per cavityWhat the parts actually measuredYou get a value for each cavity, and for more than one shot if you asked for it.
DeviationHow far the reading sits from nominalReadings bunched at one edge of the band are worth a question even when they pass.
Result (OK / NG)The shop’s own callTreat it as their opinion. Check a few lines yourself against the tolerance.
Method or equipmentCaliper, height gauge, pin gauge, CMM, vision systemThe method can resolve the tolerance. A tight position callout checked with calipers isn’t really checked.
Header: mold, cavity IDs, resin, dateWhich tool, which parts, which materialResin grade and color are the ones on your drawing, and the cavity IDs match the cavity marks on the parts.

Check the header before you read a single number

Start at the top of the sheet. The drawing number and revision should be the one you released for tooling, not the quote revision. Then look at the resin. T1 shots are sometimes run in a substitute grade or a natural color because the specified material hadn’t arrived yet. That’s not always a problem for a first look at the steel, but shrinkage differs between grades, so numbers from a substitute resin don’t prove the dimensions in the real one. If the report doesn’t name the resin, ask.

Next, how many parts were measured and from which cavities. On a four-cavity tool, one measured part tells you about one cavity. Ask which cavity each column comes from and check that against the cavity numbers molded into the parts you received. Finally, ask when the parts were measured. Plastic keeps shrinking for a while after ejection, and nylon changes size as it takes up moisture. A report measured straight off the press can look different from the same parts a few days later. Your supplier should tell you how long they waited and in what condition the parts were.

Reading the numbers: a worked example

Here’s a short extract like the ones we review. The numbers are made up for illustration; the patterns are the ones we see.

BalloonNominal and toleranceCavity 1Cavity 2Shop result
3Overall length 80.00 ±0.1579.9279.88OK
7Hole ø4.00 +0.05 / 03.983.97NG
12Wall 2.00 ±0.102.042.11OK
15Flatness 0.20 on datum AOKOKOK
18Boss position ø0.10 to A|B|C(blank)(blank)Visual OK
1

Balloon 3 passes, but look where it sits

Both cavities are on the short side of nominal, and cavity 2 is closer to the lower limit. If the tool was cut with shrink for this exact grade, that’s worth a conversation now, before you see the next resin lot. It may be fine. It’s cheaper to ask at T1 than after the first production lot.

2

Balloon 7 fails, and that may be intentional

An undersize hole on T1 is often a steel-safe choice: the toolmaker left the core pin slightly large so the hole can be opened by removing steel. Ask whether the plan is to correct it. If the answer is yes, it’s a planned correction, not a fault. If nobody planned it, it’s still an easy fix, because making a hole bigger only takes steel away.

3

Balloon 12 passes in one cavity and drifts in the other

Cavity 2 reads thicker than cavity 1 on the same wall. On a part where wall thickness drives sink or fit, you want to know if that is the steel or the process. Ask for a few more parts from cavity 2.

4

Balloon 15 says OK with no value

Flatness without a number tells you nothing you can compare later. Ask for the measured value and how the part was held. A flatness reading on a part clamped to a fixture is not the same as one on a free-standing part.

5

Balloon 18 was not measured

A position tolerance checked visually hasn’t been checked. If the boss position matters for assembly, ask for a CMM result with the datum setup shown, or for a functional check against the mating part.

Send drawings for a T1-ready molding quote

Send your drawing with the critical dimensions marked and tell us how many parts per cavity you want measured at T1. We’ll do a DFM review, confirm which supplier will build and sample the tool before we quote, and agree the report format with them up front.

Mistakes we see on T1 reports

Most problems with T1 reports aren’t dishonesty. They’re shortcuts that nobody questioned. These are the ones we send back most often:

  • Only the dimensions the shop thought were important were measured, and everything else is marked “visual OK”.
  • One part measured from a multi-cavity tool, with the result presented as if it covers all cavities.
  • Readings that equal nominal on line after line. Real parts don’t measure exactly nominal that often; ask to see the raw data.
  • The report was built from an older drawing revision, so a changed tolerance or a new feature is missing.
  • Geometric tolerances reported as pass or fail with no value, no datum setup and no method.
  • Features on drafted faces measured at an unstated height, so the number can’t be repeated. Our draft angle guide covers how to say where a drafted dimension applies.
  • Inch drawing, metric report, and rounding that turns a fail into a pass.

What happens to an out-of-tolerance line

An NG line on a T1 report isn’t a crisis. It goes one of four ways, and the report should end up showing which one was chosen. Once you’ve read the report, our guide on what to do when T1 samples fail walks through how to choose the path and what to send back to the molder.

SituationUsual routeWhat you should get back
Planned steel-safe stock (holes small, bosses tall)Toolmaker removes steel and samples againA T2 report with the corrected lines re-measured
Dimension moves with process settingsMolder adjusts the process, within limits that still make good partsReadings at the new settings, and those settings recorded
Out, but it doesn’t affect fit or functionYou accept a written deviation for that featureA signed note that names the balloon, the value and the reason
The tolerance was tighter than the part needsYou revise the drawingA new revision, and a report against it

If the change goes past correcting the tool to the drawing you agreed, it’s a design change, and the cost conversation is different. Our page on design changes after the mold is cut explains steel-safe changes, welds and new inserts. And if you’re still deciding how tight your tolerances should be, plastic part tolerances on drawings is the better starting point.

What to put in your RFQ so the T1 report is useful

The shop builds the report you ask for. If you only ask for “a dimensional report”, you’ll get whatever is quick. Put these in the RFQ instead:

  • A ballooned drawing, or a note that the supplier should balloon it and send it to you for approval before T1.
  • Which dimensions are critical, so they get measured on every cavity and every sampling round.
  • How many parts per cavity you want measured at T1, and whether you want more than one shot.
  • The method you expect for GD&T callouts, and the datum setup.
  • How long after molding the parts should be measured, and in what condition, if your resin is moisture sensitive.
  • Report format (an editable spreadsheet is easier to compare across rounds) and photos of the measuring setup for anything unusual.

If you later need a formal package, such as a full first article report or a PPAP submission, say so at quotation. That’s a different amount of work, and not every shop is set up for it. Our list of quality documents you can request helps you choose.

How we handle T1 reports

We get injection molding done through factories in China we know well. They run the press and the CMM, and we stay on top of it for you. When a T1 report comes in, we check it against your drawing before it goes to you: header, revision, resin, cavities, missing balloons, and lines that pass without a real measurement. Where something’s thin, we ask the supplier for it before you have to. We won’t tell you a part is approved. That decision is yours, and the report is what you make it with.

Frequently asked questions

What is a T1 dimensional report?

It’s the measurement report that comes with the first samples a new mold sends to the buyer. It lists each ballooned feature on the drawing, the nominal and tolerance, the measured value for each cavity, and a pass or fail result.

How many parts should be measured at T1?

There’s no single rule. Ask for at least one part from every cavity, and more for critical features or if you want to see shot-to-shot variation. Put the number in the RFQ so it’s in the tooling quote.

Is a T1 report the same as a first article inspection?

No. T1 is an early check of trial parts to guide tool corrections. A first article inspection is usually done later, on parts from the corrected tool and production process. Our first article inspection guide explains the difference.

Why is a hole undersize on my T1 samples?

Often on purpose. Toolmakers leave steel-safe stock so a hole can be opened by removing steel, which is easy, rather than adding steel, which isn’t. Ask whether it’s a planned correction.

Should I sign off the tool based on the T1 report?

Usually not on its own. Use it to agree corrections, then approve on the later sampling round when the critical lines pass in the real resin, measured the way you asked.

Send drawings for a quote with a proper T1 report

Send the drawing, the critical features, the cavity count you have in mind and the report format you want. We’ll review the part, confirm the supplier before quoting, and build the T1 report requirements into the tooling quote so they aren’t an afterthought.

Send us your drawing

A real engineer reads every request and comes back with questions or a plan for quoting.

ProteForm short RFQ

Or message us on WhatsApp.

Send Drawings
Chat on WhatsApp