Custom manufacturing support for product teams worldwide Discuss Your Project  →

Finished Assembly and Pack-Out for Plastic Parts

Plastic parts delivered as built units: fastened, joined, labeled, kitted and packed the way you want to receive them. We place the work with a factory in China that suits your parts and manage it for you. Send the bill of materials and drawings, and we'll tell you who does each step and what gets checked before the cartons are sealed.

Plastic enclosure base with brass inserts, covers, a black gasket, screws and a circuit board laid out on a review table

What Can Be Assembled Before It Ships?

Finished assembly is a good fit when a plastic part still needs hardware, joining, labeling, inspection or pack-out before it can be used. We place it with a partner factory in China that suits the job. We go through the bill of materials, the interfaces and how you’ll accept a unit first, then quote. It’s not an instant quote.

Send the current drawing revision, part list, which items you’ll supply, how parts are joined, labeling, packaging and inspection criteria. Give quantities for a pilot build and for production. Assembly cost comes mostly from labor time per unit, fixtures, test steps and pack-out, so a complete part list up front gets you a quote that holds. If the build includes wiring, electronics or a regulated product, say so at the start. It changes which factories can take it, and we’ll tell you plainly if it’s outside what we can manage.

Mechanical Assembly

Joining and Fastening

Labeling and Identification

Kitting and Pack-out

Sort These Out Before Assembly

Go through supplied parts, joining, inspection and packaging together, so the quote makes clear who's responsible for what.

Supplied components

List every item, who supplies it and the approved revision. Name the bought-in hardware, labels and packaging before we quote.

Joining and secondary operations

Put screws, inserts, welding, bonding, heat staking or snap fits on the drawing so they get checked too.

Inspection and records

Tell us the critical fits, the function checks and any records you need. Records come from the factory doing the build. See quality and documentation.

Parts Only, or Finished Units?

Some buyers just want parts. Others want a finished unit they can install or sell straight out of the carton. Which one suits you depends on the interfaces, the supplied parts and how you'll approve the result.

DecisionParts onlyFinished assembly
Primary purposeMolded or machined parts that you assemble somewhere elseA built unit, joined, labeled and packed the way we agreed
Supplied itemsUsually limited to the plastic partConfirm every hardware, label and packaging item and who provides it
AcceptancePart dimensions, appearance and material recordsPart criteria plus assembly interfaces, function checks and pack-out
ResponsibilityDefined for the part and its process routeDefined for each operation and for any customer-supplied items
What drives cost and timingLabor time per unit, fixtures, functional tests, pack-out, and how many supplied items have to arrive before the build can start

Send the assembly requirements for review

What Should You Expect on Tolerances, Quantities and Timing?

Typical industry figures for plastic sub-assemblies built in China. They're a starting point for planning. The factory's own figures for your unit go in the quote.

ItemTypical rangeWhat it means for you
Pilot buildCommonly 20 to 200 units, after the parts are approvedThis is where fit problems, fixture needs and the real labor time show up.
Batch sizeMany factories prefer batches in the hundreds of units or moreSmall batches carry the line setup and fixture cost on fewer units.
Assembly lead timeOften a week or two on top of the parts lead time for a stable buildLate supplied items, new fixtures and test stations stretch it.
Molded part toleranceAround ±0.05 to ±0.2 mm on small features, depending on material and sizeAdd up the worst case across every part in a stack. Nominal sizes hide the problem.
InspectionAQL sampling to ISO 2859-1, General Inspection Level II, is the usual default; function tests are often 100%Write the AQL levels and what counts as a critical, major or minor defect into the order.

What drives assembly cost?

Labor minutes per unit come first. Then the number of parts and fasteners, jigs and fixtures, test stations such as leak or function testers, and the packaging: retail boxes, barcode labels and carton marks. A simple screw-together unit takes minutes. Gluing, wiring and testing take far longer.

Parts you send to the factory

Items you supply have to clear import customs in China before the build starts, and the paperwork has to support the export of the finished unit. Ship them early, with a packing list that matches the bill of materials, and plan a spare quantity for losses on the line.

When are we the wrong fit?

When most of the value is in the electronics, such as PCB assembly, wire harnesses or firmware loading, an electronics contract manufacturer is set up for that. Clean-room or medical device assembly needs a regulated contract manufacturer. And for a handful of units, shipping parts to China and back can cost more than the labor it saves.

Related: ultrasonic welding, heat staking, threaded inserts, pre-shipment inspection and packaging molded parts.

Upload your bill of materials for an assembly quote

What Goes Into an Assembly

The plastic parts usually come from injection molding, thermoforming or CNC machining, and we confirm the exact grade for each. Hardware, labels and packaging go on the bill of materials. We don't guess them.

Plastic parts

ABS, PC, PC/ABS, PP, PA and similar, depending on the part and where it's used. See materials and the forming or machining route used for each part.

Hardware and inserts

Name the screws, standoffs, threaded inserts and bought-in parts, and say whether you'll send them or we should source them.

Labels, finish and pack-out

Printing, labels, bags, cartons and protective packing go in the same review, so they end up in the quote.

Compare plastic material families · Send us your component list

What to Send With an Assembly RFQ

With these, we can work out how to build it and which factory should do it.

  • Your latest drawing or 3D model, and the bill of materials
  • Which parts you'll supply and which we should source
  • How parts are joined, plus labels, finishes and packaging
  • How many for a pilot build, the first order and repeat orders
  • Critical fits, how you'll inspect a unit and any paperwork you need
  • An exploded view or assembly drawing with item numbers that match the bill of materials
  • Screw torque values, the adhesive spec, label artwork (AI or PDF) and carton markings
  • Photos or a short video of a good unit if you already build it somewhere

You can attach drawings or CAD (PDF, STEP, IGES, DWG, DXF or ZIP, up to 10 MB each) to the quote form. Confidential design? We'll sign your NDA before you send full drawings. If your drawings are export-controlled, don't attach them to the quote form. Send a short non-confidential summary first and see our controlled project requirements.

Request an assembly review

What We Check Before We Quote

These are the points we settle with the factory before we put cost, timing or inspection terms in a quote.

Part list and interfaces

Every component, how it's joined and which fits are critical. Then we work out how to build it.

Supplied items and responsibility

Who supplies hardware, labels and packaging, and who's on the hook if a supplied item doesn't fit or shows up late.

Acceptance requirements

The function checks, how it should look, how samples get approved and what records you need.

What to get in writing

Which factory builds the unit, which golden sample is the approved reference, who pays when a supplied item is late or wrong, and a schedule split into parts ready, pilot build, your approval and production.

Request an assembly review

Close-up of a plastic enclosure interior with knurled brass threaded inserts in bosses, a gasket, screws and standoffs

When Does It Pay to Add Assembly?

It’s worth adding assembly when the product gets installed or packed as a unit, or when you want joining, hardware and labeling handled by the same factory that makes the parts. We set up the build with the factory and stay on it from the first unit to the sealed carton.

  • Confirm the bill of materials and which items you’ll supply.
  • Put joining, labels, finishes and pack-out on the drawing.
  • Decide the function checks and appearance rules before a first article or golden sample is agreed.
  • Make sure the quote says who’s responsible for anything you supply.

What Assembly Jobs Do Buyers Usually Send?

Typical jobs are equipment housings, covers, control panels and kits that mix plastic parts with hardware. Each one still needs its own look at interfaces, supplied items, environment and inspection.

  • Equipment housings and covers: how it mounts, access, labels and any boards or hardware you’ll send.
  • Panels and sub-assemblies: fasteners, inserts, windows and function checks.
  • Kitted parts: how they’re packed and labeled, and which items ship together.

Related processes include injection molding, thermoforming and CNC machining.

Plastic panel sub-assembly kit with a front bezel, window gasket, inner frame, screws, hinges and a rear housing

From Your Bill of Materials to an Assembly Plan

Send the current part revision, the bill of materials, how parts are joined and how you'll inspect a unit. We work out the build and pick the factory, then agree sample approval and production checks with you before we quote.

Request a Project Review

Finished Assembly FAQs

Send the drawings, a bill of materials with revisions, which items you’ll supply, the joining methods, label and packaging specs, the checks a finished unit must pass, and quantities for a pilot build and production. We review it with the factory and send a quote that shows parts, assembly and packaging separately, with a schedule for parts, pilot build, your approval and production. The pilot build is where fit problems show up, so plan for it before the first full order.

We agree that in the quote: who supplies the hardware, labels and packaging, and who’s on the hook if something arrives late or wrong. Anything you supply needs a clear revision and gets checked when it comes in.

You define what a good unit is, and we put it in writing before the pilot build: the fits and interfaces to check, a function test such as a button press, a seal or a hinge cycle, labels and appearance, and the pack-out. The factory records the results, and the golden sample you approve becomes the reference for production.

Yes. The plastic parts can be injection molded, thermoformed or CNC machined, then put together with the hardware, joining method and packing you’ve agreed. We look at all the steps together in one review.

More Reading

Assembly interfaces and stack-up

Mark the fits that matter, fastener locations and the tolerance stack-up on the drawing. When parts come from different processes, say a molded housing and a machined bracket, the stack-up is where most fit problems start, so we check it before the route is quoted.

Related forming and machining routes

Each plastic part might be molded, thermoformed or machined, and some need inserts or welding before they go on the line. Settle the route for each part before the assembly scope is fixed. See secondary operations.

Supplied parts and responsibility

Agree who supplies hardware, labels and packaging before we quote, and who pays if a supplied item is late or wrong.

Upload the bill of materials, an exploded view and drawings, with quantities for the pilot build and the first order. We’ll come back with how we’d build it, a price split into parts, assembly and packaging, and the questions we need answered first.

Send us your drawing

A real engineer reads every request and comes back with questions or a plan for quoting.

ProteForm short RFQ

Or message us on WhatsApp.

Send Drawings
Chat on WhatsApp