Custom manufacturing support for product teams worldwide Discuss Your Project  →

How to Inspect Plastic Parts Before They Leave China

Resources / Buyer’s Playbook / Pre-Shipment Inspection

The first-article samples already passed, and now a production lot is sitting in cartons. You need to know how to inspect goods before shipping China so a bad box does not travel with the good ones. Pre-shipment inspection is a check of the lot you are about to release, not a second first-article approval. This page covers what to put in that plan, when a third-party inspector helps, and what to do if the lot fails.

Generic illustration of unbranded plastic parts and a mold insert on an inspection bench, standing in for an outgoing check before a lot ships

Generic illustration, not a part ProteForm made.

How is pre-shipment inspection different from first-article or T1 approval?

First-article inspection, and the T1 samples that often come before it, answer a process question: can this tool, on this setup, make a part that matches the drawing? Pre-shipment inspection answers a different question: is this lot, the one about to leave the shop or the port, the same as what you approved?

A good T1 does not guarantee a good lot. Resin lots change, operators change, a cavity can start flashing, a jig can wear, and packing can scuff a face that measured fine on the bench. If you want to know how to inspect goods before shipping China, keep those two steps apart. Do not ask a pre-shipment inspector to approve a tool that was never sampled, and do not skip the lot check because the first-article report was clean. For tool-trial stages and what an FAI report contains, use sample approval and first article inspection. This page stays with the outgoing lot.

CheckWhat it is forWhat it is not
First-article or T1 approvalConfirming that the tool and process can make a part that matches the drawingA check that every carton in a later production lot is good
Pre-shipment or outgoing inspection of the lotChecking this packed lot against the approved sample, drawing and plan, before it leavesA second tool approval, or a substitute for a missing first-article sign-off
A shop’s outgoing reportA record from the people who made the lot, useful when you already trust the processAn independent visit, and not automatically complete if the plan or photos are thin
A third-party inspector at the shop or a consolidation pointAn extra set of eyes on a first lot, a new shop, or a costly return riskA guarantee, and not a reason to skip a written plan or a golden sample

What should go in the inspection plan?

Write the plan against the approved drawing and the approved sample, not against a memory of what the part should look like. Name what will be checked, on how many pieces, with what method, what happens if a check fails, and whether the check is before packing, after packing, or both, if packing itself can damage the part. Most plans cover four kinds of check:

  • Dimensional: the features you actually tolerate on the drawing, measured with the method you accepted at first article (hand tools, gauges or a CMM; see when you need CMM inspection). If the drawing is noisy, fix it; see what tolerances to put on a plastic or CNC drawing rather than inventing a shop-floor list that contradicts it.
  • Cosmetic: sink, weld lines, blush, scratches, splay, and color, judged against a limit sample or a written class, not against “looks nice.” The plan should say which injection molding defects are rejectable on this part. Our guide to cosmetic inspection criteria shows how to set surface classes, limits and limit samples.
  • Function: fit to the mating part, a clip, a hinge, a seal, or a go/no-go you already use. If function needs a fixture, that fixture should be at the inspection.
  • Quantity, revision and packing: the count, the labeled revision, and the carton marks you agreed. A correct part in the wrong carton is still a failed shipment. See packaging and shipping molded parts when the risk is in the carton rather than the mold.

Photos belong in the record: overall, close-ups of cosmetic zones, the packed carton, and any measurement setup that would be hard to describe later. A sealed golden sample, held against a written protocol, gives the inspector something physical to compare. That sample is a reference for the lot, not a second first-article approval, and it should be the same revision you already signed, not a prettier piece pulled from a later run.

How to use AQL without treating one level as the standard

AQL, or acceptable quality limit, is a sampling idea. You inspect a sample of the lot, and you fail the lot if the defects in that sample are above the threshold you set for each class. It is a way to inspect goods before shipping without measuring every piece.

It is not a single number you should copy onto every purchase order and call “the standard.” A safety-critical clip, a visible A-surface, and a hidden bracket do not belong on the same plan. Tightening every class “to be safe” can reject a lot for marks you would have accepted. Leaving the plan blank, or writing only “AQL” with no level and no defect class, gives the inspector nothing to enforce. Write the sampling plan and the defect classes for this part, or attach the company standard you already use and make sure it matches the drawing and the golden sample. We will not invent a default level and tell you it is what everyone uses.

Send drawings for a production quote with inspection

Send the model or drawing, material, quantity, the inspection plan you already have, and any golden sample or first-article approval. We’ll review the design for manufacture, confirm which supplier would make the parts, and only then quote. If you do not have a plan yet, say what has to be measured and what a customer will see.

When a third-party inspector is useful, and when the shop’s report is enough

The shop’s own outgoing inspection is the first record you should expect: measurements, a cosmetic review, a count, and photos. On a stable process, with a shop you already know, and with a plan you can audit from the documents, that report can be enough.

A third-party inspector is more useful when the cost of a bad lot arriving is high: a first production run, a new supplier, a cosmetic or safety-critical part, or a long freight path. The inspector works to your plan. If the plan is thin, the visit will be thin. An inspector is not a guarantee. They sample, they compare, and they report. They cannot see every piece unless you pay for a sort, and they cannot fix a process in an afternoon. If you need process capability evidence or a formal production-part approval pack, that is a different document set; see PPAP for molded parts rather than asking a pre-shipment visit to stand in for it.

What happens when a lot fails

Agree the path before the inspection, while you still have time to hold the lot. The usual options are a sort and rework, a re-inspection of the corrected lot, a written concession on a defined, non-critical issue, or a rejection so the lot does not ship. Name who pays for rework, scrap, and a second visit, and keep failed pieces or a sealed sample so a later argument is about the same evidence. Do not let a failed lot ship on a promise that it will be sorted at destination unless you have actually accepted that plan. Once the cartons leave, you are negotiating over freight and a problem you can no longer walk to. If the failure points back to an unapproved process, return to first-article thinking rather than inspecting your way out of it.

How this works if you buy through ProteForm

We work with a network of factories in China we know well. We’re not an inspection company, though. On projects we quote, we go through the design, tell you which factory would make it, and can help you put an inspection plan, a golden-sample protocol, and a fail path into the project before the first lot is packed. We can work with a shop outgoing report, or with a third-party inspector you appoint, against that plan. Send the drawing, the quantity, and any inspection documents you already have with the request a quote. If first-article approval is already done, include that record. We will not quote a standalone inspection visit for a shipment we are not coordinating.

When we are not the right fit

If you only want someone to book a third-party inspector on goods we did not quote, we are not that desk. Hire an inspection firm directly. If you need a laboratory method, a certified metrology house, or a legal finding about a failed delivery, that is also outside what we do. If the tool has never been sampled, do not ask us to treat a pre-shipment walk-through as first-article approval.

What to include in an RFQ

  • The model or drawing, revision, material, and the quantity of the lot.
  • The inspection plan you have, or a list of the dimensions, cosmetic zones and function checks that matter.
  • Any first-article approval, golden sample, or limit sample that the lot should be compared with.
  • Packing requirements, the ship-to location, and whether a third-party inspector is already appointed.

Frequently asked questions

Is pre-shipment inspection the same as first-article inspection?

No. First-article or T1 approval asks whether the tool and the process can make a part that matches the drawing. Pre-shipment inspection asks whether this packed production lot matches what you already approved. Do not use a pre-shipment visit as a substitute for sample approval, and do not skip the lot check because T1 passed. See sample approval and first article inspection for the earlier step.

What AQL should I use to inspect goods before shipping from China?

AQL, or acceptable quality limit, is a way to set a sampling plan and a threshold for how many defects in that sample will fail the lot. There is no single AQL level that you should treat as the standard for every plastic part. Write the levels and the defect classes for this part. Do not copy a number from an unrelated job just to fill a form.

Do I need a third-party inspector for every lot?

No. A shop’s outgoing report can be enough when you already know the process, the defect history is clean, and you have a clear plan with photos and data you can review. A third-party inspector is more useful on a first production lot, a new shop, a cosmetic or safety-critical part, or a shipment that would be expensive to return. ProteForm is not an inspection company; if you only need a standalone booking, hire an inspection firm directly.

What should happen if the lot fails?

Agree this before the inspector arrives, not in a hurried message after a fail. Typical paths are sort and rework with a re-inspection, a concession on a defined non-critical issue, or rejection of the lot so it does not ship. Name who pays for rework and for a second visit, and keep failed parts or a sealed sample for later.

Can ProteForm book a standalone inspection for goods we did not coordinate?

No. We help plan the inspection on the projects we quote. We are not a public inspection desk, and we will not book a walk-through of someone else’s shipment as a standalone service.

Send drawings for a production quote with inspection

Send the model or drawing, material, quantity, the inspection plan you already have, and any golden sample or first-article approval. We’ll review the design for manufacture, confirm which supplier would make the parts, and only then quote. If you do not have a plan yet, say what has to be measured and what a customer will see.

Send us your drawing

A real engineer reads every request and comes back with questions or a plan for quoting.

ProteForm short RFQ

Or message us on WhatsApp.

Send Drawings
Chat on WhatsApp