PPAP, the Production Part Approval Process, is the automotive industry’s method for proving that a supplier understands the customer’s requirements and that its production process can make conforming parts consistently, at the quoted rate. It comes from the AIAG reference manual used with IATF 16949 quality systems, and many non-automotive buyers borrow it in simplified form. For buyers of molded and machined plastic parts, PPAP is far more than a dimensional report: it covers design records, risk analysis, control plans, measurement systems and process capability. This guide explains the elements, submission levels, when a submission is required, what is specific to plastic parts, and how to ask for the right level without paying for paperwork you do not need.
PPAP vs first article inspection
A first article inspection confirms that the first parts from a tool or process meet the drawing. PPAP includes dimensional results but adds evidence about the process: how it was designed, where the risks are, how it is controlled, whether the gauges are reliable and whether the process is capable. FAI asks “are these parts right?” PPAP asks “will the parts stay right in production?” Aerospace uses AS9102 FAI for a similar purpose with a different format. Neither approval replaces a check of the packed production lot before it ships; see how to inspect plastic parts before they leave China.
The 18 PPAP elements
| # | Element | What it means for a molded part |
|---|---|---|
| 1 | Design records | The released drawing and CAD, including material specification |
| 2 | Authorized engineering change documents | Any approved changes not yet on the drawing |
| 3 | Customer engineering approval | Where the customer requires it, for example after testing |
| 4 | Design FMEA | Only if the supplier is design-responsible |
| 5 | Process flow diagram | Drying, molding, trimming, secondary operations, inspection, packing |
| 6 | Process FMEA | Risks such as short shots, sink, contamination, wrong resin lot, mixed cavities |
| 7 | Control plan | What is checked, how, how often and the reaction plan |
| 8 | Measurement system analysis | Gauge R&R and similar studies on the gauges used |
| 9 | Dimensional results | Every drawing dimension measured, usually for each cavity |
| 10 | Material and performance test results | Resin certificates, and any functional or environmental tests |
| 11 | Initial process studies | Capability data (such as Ppk) for special characteristics |
| 12 | Qualified laboratory documentation | Scope of the labs that performed tests |
| 13 | Appearance approval report | Color, gloss, texture for appearance items |
| 14 | Sample production parts | Parts from the production run |
| 15 | Master sample | A retained, signed sample |
| 16 | Checking aids | Fixtures and gauges used to check the part |
| 17 | Customer-specific requirements | Any extra items the customer lists |
| 18 | Part submission warrant (PSW) | The summary document signed by the supplier |
Not every element applies to every part, and not every element is submitted; the level decides what is sent and what is retained at the supplier.
Submission levels
| Level | What is submitted |
|---|---|
| 1 | Warrant only (and appearance approval if requested) |
| 2 | Warrant with product samples and limited supporting data |
| 3 | Warrant with product samples and complete supporting data; the usual default |
| 4 | Warrant and other requirements defined by the customer |
| 5 | Warrant with samples and complete supporting data reviewed at the supplier’s site |
At every level the supplier should hold the full file; the level only controls what is sent. Asking for level 3 when level 2 would do adds work and cost; asking for level 1 on a critical new part may leave you with too little evidence.
Ask what documentation your part needs
When a PPAP submission is required
- A new part or a new supplier.
- An engineering change to the design, specification or material.
- A new, additional, replacement or modified tool, including extra cavities.
- A process change, such as a new machine, new secondary operation or different resin supplier.
- Moving production to another site, or transferring a mold; see mold transfer.
- Restarting a tool after a long period of inactivity, as defined by the customer.
- A change in sub-supplier for materials or services.
Customers usually expect to be notified before such changes, not after; the supply agreement should state this.
What is specific to plastic parts
- Cavities. Dimensional results are normally expected for every cavity in a multi-cavity tool; see multi-cavity and family molds.
- Conditioning. Plastic parts shrink and absorb moisture after molding. Measurement timing and conditions, especially for nylon, should be defined.
- Process parameters. The approved process window (melt and mold temperature, pressure, hold time, drying) belongs in the control plan, because changing it can change dimensions.
- Resin traceability. Material certificates, lot traceability and any regrind policy should be documented.
- Appearance. Color, gloss and texture are covered by the appearance approval report, with agreed masters; see surface finish standards.
- Significant production run. The sample parts should come from a run using production tooling, materials, operators and rates, not a hand-tuned trial.
Capability studies
Initial process studies measure how consistently the process produces the special characteristics marked on the drawing. Capability indices such as Ppk compare the spread and centering of the measured data with the tolerance. Customers set their own acceptance values, so the target should be stated in the RFQ. Tolerances that are tighter than the process can hold will show up here; reviewing tolerances early is cheaper than failing a study. See drawing tolerances.
Common problems
- The PPAP level is not stated at quotation, so the supplier did not plan or price it.
- Special characteristics are not marked, so capability studies cover the wrong dimensions.
- Samples come from a trial run rather than production conditions.
- Gauge studies are skipped or done on unsuitable gauges.
- The control plan is generic and does not match the actual process.
- Tool or process changes are made later without a new submission.
PPAP compared with other approval approaches
| Approach | Typical industry | Scope |
|---|---|---|
| PPAP (AIAG) | Automotive and related supply chains | Process and product evidence; submission levels |
| AS9102 FAI | Aerospace | Detailed first-article records for design, material and process |
| Simple FAI / dimensional report | General industry | Dimensions, material certificate, appearance |
| Customer-specific approval | Any | Whatever the customer defines; often a subset of PPAP |
For non-automotive projects a “PPAP-lite” request is common: full dimensional results per cavity, material certificates, a control plan and appearance approval, without full FMEA or capability data. Spell out exactly which elements you want.
How to ask for PPAP
- State the level and any customer-specific requirements in the RFQ.
- Mark special and critical characteristics on the drawing.
- State capability targets and the sample quantity for studies.
- Say whether forms must follow a specific template.
- Confirm who pays for extra sampling, testing and laboratory work.
ProteForm does not claim IATF 16949 certification for itself or any supplier unless documents name the producing legal entity and scope. Ask us which documentation the confirmed supplier can provide for your part; see quality.
Frequently asked questions
What does PPAP stand for?
Production Part Approval Process, the AIAG method used mainly in automotive supply chains to approve production parts and processes.
What is the difference between PPAP and FAI?
FAI verifies first parts against the drawing. PPAP adds process evidence such as FMEA, control plan, gauge studies and capability.
What is PPAP level 3?
The usual default: warrant, product samples and complete supporting data submitted to the customer.
Do non-automotive buyers need PPAP?
Not usually in full. Many request a reduced set of elements; state exactly which ones.
When is a new PPAP needed?
For new parts, engineering changes, new or modified tools, process or site changes, and other changes the customer defines.