Supplied components
List every item, who supplies it and the approved revision. Name the bought-in hardware, labels and packaging before we quote.
Forming
Injection MoldingPlastic parts in production numbers. We check your drawing first.Insert MoldingThreaded inserts, pins and terminals molded in.LSR MoldingSilicone seals, gaskets and soft parts.Thermoforming / Vacuum FormingVacuum and pressure-formed covers and housings.ExtrusionSend us the drawing and we look at it case by case.Blow MoldingSend us the drawing and we look at it case by case.Compression MoldingSend us the drawing and we look at it case by case.Rotational MoldingHollow tanks, containers, ducts and housings.Machining & Secondary
CNC MachiningPlastic machining for prototypes and production.Ultrasonic WeldingDone as part of our secondary operations work.Heat Staking / InsertsDone as part of our secondary operations work.BondingDone as part of our secondary operations work.Laser CuttingDone as part of our secondary operations work.Surface Finishing
PaintingColor-matched, soft-touch and UV-coated finishes.Silk Screen / Pad PrintingLogos, legends and markings on molded parts.PlatingChrome plating and metallizing on plastic.Laser EngravingSerial numbers, codes and permanent marks.IMD / IMLGraphics molded into the part surface.Specialty processes
Foam MoldingAsk us. We look at these case by case.3D PrintingPrototypes, fixtures and low-volume printed parts.Vacuum CastingSmall batches of urethane parts from silicone molds.Overmolding / 2K MoldingTPE or TPU over rigid plastic or metal inserts. View all capabilities →Resources
Plastic parts delivered as built units: fastened, joined, labeled, kitted and packed the way you want to receive them. We place the work with a factory in China that suits your parts and manage it for you. Send the bill of materials and drawings, and we'll tell you who does each step and what gets checked before the cartons are sealed.

Finished assembly is a good fit when a plastic part still needs hardware, joining, labeling, inspection or pack-out before it can be used. We place it with a partner factory in China that suits the job. We go through the bill of materials, the interfaces and how you’ll accept a unit first, then quote. It’s not an instant quote.
Send the current drawing revision, part list, which items you’ll supply, how parts are joined, labeling, packaging and inspection criteria. Give quantities for a pilot build and for production. Assembly cost comes mostly from labor time per unit, fixtures, test steps and pack-out, so a complete part list up front gets you a quote that holds. If the build includes wiring, electronics or a regulated product, say so at the start. It changes which factories can take it, and we’ll tell you plainly if it’s outside what we can manage.
Go through supplied parts, joining, inspection and packaging together, so the quote makes clear who's responsible for what.
List every item, who supplies it and the approved revision. Name the bought-in hardware, labels and packaging before we quote.
Put screws, inserts, welding, bonding, heat staking or snap fits on the drawing so they get checked too.
Tell us the critical fits, the function checks and any records you need. Records come from the factory doing the build. See quality and documentation.
Some buyers just want parts. Others want a finished unit they can install or sell straight out of the carton. Which one suits you depends on the interfaces, the supplied parts and how you'll approve the result.
| Decision | Parts only | Finished assembly |
|---|---|---|
| Primary purpose | Molded or machined parts that you assemble somewhere else | A built unit, joined, labeled and packed the way we agreed |
| Supplied items | Usually limited to the plastic part | Confirm every hardware, label and packaging item and who provides it |
| Acceptance | Part dimensions, appearance and material records | Part criteria plus assembly interfaces, function checks and pack-out |
| Responsibility | Defined for the part and its process route | Defined for each operation and for any customer-supplied items |
| What drives cost and timing | Labor time per unit, fixtures, functional tests, pack-out, and how many supplied items have to arrive before the build can start | |
Typical industry figures for plastic sub-assemblies built in China. They're a starting point for planning. The factory's own figures for your unit go in the quote.
| Item | Typical range | What it means for you |
|---|---|---|
| Pilot build | Commonly 20 to 200 units, after the parts are approved | This is where fit problems, fixture needs and the real labor time show up. |
| Batch size | Many factories prefer batches in the hundreds of units or more | Small batches carry the line setup and fixture cost on fewer units. |
| Assembly lead time | Often a week or two on top of the parts lead time for a stable build | Late supplied items, new fixtures and test stations stretch it. |
| Molded part tolerance | Around ±0.05 to ±0.2 mm on small features, depending on material and size | Add up the worst case across every part in a stack. Nominal sizes hide the problem. |
| Inspection | AQL sampling to ISO 2859-1, General Inspection Level II, is the usual default; function tests are often 100% | Write the AQL levels and what counts as a critical, major or minor defect into the order. |
Labor minutes per unit come first. Then the number of parts and fasteners, jigs and fixtures, test stations such as leak or function testers, and the packaging: retail boxes, barcode labels and carton marks. A simple screw-together unit takes minutes. Gluing, wiring and testing take far longer.
Items you supply have to clear import customs in China before the build starts, and the paperwork has to support the export of the finished unit. Ship them early, with a packing list that matches the bill of materials, and plan a spare quantity for losses on the line.
When most of the value is in the electronics, such as PCB assembly, wire harnesses or firmware loading, an electronics contract manufacturer is set up for that. Clean-room or medical device assembly needs a regulated contract manufacturer. And for a handful of units, shipping parts to China and back can cost more than the labor it saves.
Related: ultrasonic welding, heat staking, threaded inserts, pre-shipment inspection and packaging molded parts.
The plastic parts usually come from injection molding, thermoforming or CNC machining, and we confirm the exact grade for each. Hardware, labels and packaging go on the bill of materials. We don't guess them.
ABS, PC, PC/ABS, PP, PA and similar, depending on the part and where it's used. See materials and the forming or machining route used for each part.
Name the screws, standoffs, threaded inserts and bought-in parts, and say whether you'll send them or we should source them.
Printing, labels, bags, cartons and protective packing go in the same review, so they end up in the quote.
Compare plastic material families · Send us your component list
With these, we can work out how to build it and which factory should do it.
You can attach drawings or CAD (PDF, STEP, IGES, DWG, DXF or ZIP, up to 10 MB each) to the quote form. Confidential design? We'll sign your NDA before you send full drawings. If your drawings are export-controlled, don't attach them to the quote form. Send a short non-confidential summary first and see our controlled project requirements.
These are the points we settle with the factory before we put cost, timing or inspection terms in a quote.
Every component, how it's joined and which fits are critical. Then we work out how to build it.
Who supplies hardware, labels and packaging, and who's on the hook if a supplied item doesn't fit or shows up late.
The function checks, how it should look, how samples get approved and what records you need.
Which factory builds the unit, which golden sample is the approved reference, who pays when a supplied item is late or wrong, and a schedule split into parts ready, pilot build, your approval and production.
It’s worth adding assembly when the product gets installed or packed as a unit, or when you want joining, hardware and labeling handled by the same factory that makes the parts. We set up the build with the factory and stay on it from the first unit to the sealed carton.
Typical jobs are equipment housings, covers, control panels and kits that mix plastic parts with hardware. Each one still needs its own look at interfaces, supplied items, environment and inspection.
Related processes include injection molding, thermoforming and CNC machining.
Send the current part revision, the bill of materials, how parts are joined and how you'll inspect a unit. We work out the build and pick the factory, then agree sample approval and production checks with you before we quote.
Request a Project ReviewSend the drawings, a bill of materials with revisions, which items you’ll supply, the joining methods, label and packaging specs, the checks a finished unit must pass, and quantities for a pilot build and production. We review it with the factory and send a quote that shows parts, assembly and packaging separately, with a schedule for parts, pilot build, your approval and production. The pilot build is where fit problems show up, so plan for it before the first full order.
We agree that in the quote: who supplies the hardware, labels and packaging, and who’s on the hook if something arrives late or wrong. Anything you supply needs a clear revision and gets checked when it comes in.
You define what a good unit is, and we put it in writing before the pilot build: the fits and interfaces to check, a function test such as a button press, a seal or a hinge cycle, labels and appearance, and the pack-out. The factory records the results, and the golden sample you approve becomes the reference for production.
Yes. The plastic parts can be injection molded, thermoformed or CNC machined, then put together with the hardware, joining method and packing you’ve agreed. We look at all the steps together in one review.
Mark the fits that matter, fastener locations and the tolerance stack-up on the drawing. When parts come from different processes, say a molded housing and a machined bracket, the stack-up is where most fit problems start, so we check it before the route is quoted.
Each plastic part might be molded, thermoformed or machined, and some need inserts or welding before they go on the line. Settle the route for each part before the assembly scope is fixed. See secondary operations.
Agree who supplies hardware, labels and packaging before we quote, and who pays if a supplied item is late or wrong.
Upload the bill of materials, an exploded view and drawings, with quantities for the pilot build and the first order. We’ll come back with how we’d build it, a price split into parts, assembly and packaging, and the questions we need answered first.
A real engineer reads every request and comes back with questions or a plan for quoting.