Combine compatible materials and inserts in one production-ready molded component.
ISO 9001:2015 | ISO 13485:2016 | AS9100D | ITAR Registered
Innovative Teams We Support
NORTHWINDGlobexVERTEX DYNAMICSinitechHELIODYNESONARA
Our original overmolding planning process reviews how a second material can be formed over a prepared substrate or insert to create grips, seals, housings, and other integrated interfaces.
Assess bond strategy, geometry, material pairing, tool access, and the completed part’s use conditions before the manufacturing route is selected.
An original guide for planning material interfaces, bond strategy, tool access, and compatible material choices.
| Guideline | US | Metric |
|---|---|---|
| Maximum part size | Quoted with the combined tool plan | Quoted with the combined tool plan |
| Volume | Reviewed with the material pairing | Reviewed with the material pairing |
| Depth | Feature reviewed with the parting line | Feature reviewed with the parting line |
| Projected mold area | Tooling dependent | Tooling dependent |
M = mechanical retention and C = compatible material bond. Final pairing is reviewed with the component geometry and resin selection.
| Overmold material | ABS | PC | Nylon | PET | TPE |
|---|---|---|---|---|---|
| ABS | C | C | M | M | — |
| PC | C | C | M | M | C |
| TPU | M | M | C | M | M |
| TPE | M | M | M | M | M |
| LSR | C | C | M | M | M |
The process captures or bonds a second material over a first molded part or insert. Choose it when a permanent integrated interface is preferable to a separate sleeve, seal, fastener, or secondary assembly step.
A practical guide to planning wall sections, draft, ribs, and production-ready part features.
An original overview of selecting a resin around function, appearance, and operating environment.
A recorded walkthrough of early tooling, inspection, and scale-up decisions.